Inches |
1/4 |
1/2 |
3/4 |
1 |
1 1/4 |
1 1/2 |
1/4 |
308 |
N/A |
N/A |
N/A |
N/A |
N/A |
1/2 |
154 |
77 |
N/A |
N/A |
N/A |
N/A |
3/4
|
103
|
51 |
34 |
N/A |
N/A |
N/A |
1 |
77 |
38 |
26 |
19 |
N/A |
N/A |
1 1/4 |
62 |
31 |
20 |
15 |
12 |
N/A |
1 1/2 |
51 |
26 |
17 |
13 |
10 |
9 |
1 3/4 |
44 |
22 |
15 |
11 |
9 |
7 |
2 |
39 |
19
|
13 |
10 |
8 |
6 |
2 1/2 |
31 |
15 |
10 |
8 |
6 |
5 |
3 |
26 |
13 |
9 |
6 |
5 |
4 |
Coverage
For Coating
THICKNESS OF COATING
APPLIED |
COVERAGE PER U.S. GALLON (100%
solids) |
1/4"=250 mils |
6.4 sq.ft. |
3/16"=187.5 mils |
8.5 sq.ft. |
1/8"=125mils/100 mils |
12.8 sq.ft./16.0sq.ft. |
1/16"=62.5 mils/50 mils |
25.5 sq.ft./32 sq.ft. |
1/32"=31.25 mils/20 mils |
51 sq.ft./80 sq.ft. |
1/64"=15.625 mils 10 mils 5
mils 1 mils |
102 sq.ft. 160 sq.ft. 320
sq.ft. 1600 sq.ft. |
Epoxy
Mortar and Patching Coverage
Epoxy Binder gallons |
Silica Sand gallons |
Approximate Mortar yield in
gallons |
1 |
+1 |
1.6 |
1 |
+2 |
2.2 |
1 |
+3 |
2.8 |
1 |
+4 |
3.4 |
1 |
+5 |
4.0 |
1 gallon of Sand Silica Sand=12 to 14 lbs. Approximate
Mixed Epoxy
With Sand Coverage
Mortar (Epoxy Binder &
Sand) |
Coverage (square
feet) |
Thickness (inches) |
1
gallon |
25.7 |
1/16 |
1
gallon |
12.8 |
1/8 |
1
gallon |
8.6 |
3/16 |
1
gallon |
6.4 |
1/4 |
1
gallon |
4.3 |
3/8 |
1
gallon |
3.2 |
1/2 |
Helpful conversion factors:
1 gallon=231 cubic
inches 1 cubic yard=202 gallons=27 cubic feet 1 cubic foot=7.48
gallons
Yield & Coverage per gallon of mixed Epoxy
Systems
Parts
of sand/gallon Epoxy resin |
Yield
Mortar gallons |
Depth
vs Coverage (Inches to Square feet) |
1 |
1.6
gal. |
1/16"=41.12 1/8"=20.48 3/16"=13.76 1/4"=10.24 3/8"=6.88 1/2"=5.12 |
2 |
2.2
gal. |
1/16"=56.54 1/8"=28.16 3/16"=13.76 1/4"=10.24 3/8"=6.88 1/2"=5.12 |
3 |
2.8
gal. |
1/16"=71.96 1/8"=35.84 3/16"=24.08 1/4"=17.92 3/8"=12.04 1/2"=8.96 |
4 |
3.4
gal. |
1/16"=87.38 1/8"=43.52 3/16"=24.08 1/4"=21.76 3/8"=14.62 1/2"=10.88 |
Cost per square foot at various
mix ratios and costs
Cost
per gallon |
1/16" |
1/8" |
3/16" |
1/4" |
3/8" |
1/2" |
(1)
$40.00 $45.00 $50.00 $55.00 $60.00 $65.00 |
0.97 1.09 1.22 1.34 1.46 1.58 |
1.95 2.20 2.44 2.69 2.93 3.17 |
2.91 3.27 3.63 4.00 4.36 4.72 |
3.91 4.39 4.88 5.37 5.86 6.35 |
5.81 6.54 7.27 7.99 8.72 9.45 |
7.81 8.79 9.77 10.74 11.72 12.70 |
(2)
$40.00 $45.00 $50.00 $55.00 $60.00 $65.00 |
0.71 0.80 0.88 0.97 1.06 1.15 |
1.42 1.60 1.78 1.95 2.13 2.31 |
2.11 2.38 2.64 2.91 3.17 3.44 |
2.84 3.20 3.55 3.91 4.26 4.62 |
4.23 4.76 5.29 5.81 6.34 6.87 |
5.68 6.39 7.10 7.81 8.52 9.23 |
(3)
$40.00 45.00 $50.00 $55.00 $60.00 $65.00 |
0.56 0.63 0.69 0.76 0.83 0.90 |
1.12 1.26 1.40 1.53 1.67 1.81 |
1.66 1.87 2.08 2.28 2.49 2.70 |
2.23 2.51 2.79 3.07 3.35 3.63 |
3.32 3.74 4.15 4.57 4.98 5.4 |
4.46 5.02 5.58 6.14 6.70 7.25 |
(4)
$40.00 $45.00 $50.00 $55.00 $60.00 $65.00 |
0.46 0.51 0.57 0.63 0.69 0.74 |
0.92 1.03 1.15 1.26 1.38 1.49 |
1.37 1.54 1.71 1.88 2.05 2.22 |
1.84 2.07 2.30 2.53 2.76 2.99 |
2.74 3.08 3.42 3.76 4.10 4.45 |
3.68 4.14 4.60 5.06 5.51 5.97 |
How to use this
table:
As a
guide, three parts of sand makes a trowelable mortar
Select a mix ratio
and depth o coverage, select the cost per gallon for the epoxy to find the cost
per square foot
NOTE: 1. This cost does not include sand 2.
This chart does not account for the need to purchase full units of
epoxy
Example: SAND, EPOXY RATIO=3.1: DEPTH COVERAGE 1/4": COST
$50.00/GALLON Answer: COVERAGE: 17.92 Sq. Ft./Gallon: Cost/Sq.Ft.
$2.79